Stena Line wishes to advise customers that Stena Superfast VIII which operates on the Cairnryan - Belfast route is required to attend dry dock for a short period from 1st March until 3rd March 2020.
During this period the Stena Superfast X will operate as the cover vessel delivering the normal route schedule. There will however be a maximum height limit of 4.65m for traffic on Stena Superfast X sailings.
Stena Line Freight